Novarly ParcelRenewable planning

Renewable planning Battery storageIsle of Wight

Battery storage planning in Isle of Wight

Isle of Wight has decided 2 battery storage schemes and approved 100% of them, taking a median of 18.3 months to decide. Consented capacity: 30 MW.

100%
Approved
2 granted · 0 refused
18.3 mo
Median decision
UK 6 mo
30 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Isle of Wight compares

Against the 137 UK authorities with 5+ battery storage decisions, Isle of Wight sits in the 73rd percentile for approval rate (8 points above the England average) and the 1st percentile for speed.

Decisions by year

35Approved — 1 (2023)123Approved — 1 (2025)125
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (2)

SchemeMWStatusDecided
Sunny Oaks Renewable Energy Park
Ridge Clean Energy Limited · 22/01585/FUL · 34.3 mo to decide
28.5Awaiting Construction2025-07-15
Arreton Valley Nursery, Hale Common - Battery Storage
Iow Squirrel Limited · 23/00900/FUL · 2.4 mo to decide
1.26Awaiting Construction2023-07-31

Does Isle of Wight approve battery storage schemes?

Yes — of the 2 battery storage schemes Isle of Wight has decided, 100% were approved (2 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Isle of Wight?

The median time from application to decision is 18.3 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Isle of Wight consented?

30 MW has been consented across 2 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Isle of Wight

Solar in Isle of WightOnshore wind in Isle of Wight

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report