Battery storage planning in Fylde

Fylde has decided 3 battery storage schemes and approved 100% of them, taking a median of 6.7 months to decide. Consented capacity: 52 MW. 1 application still awaiting a decision.

100%
Approved
3 granted · 0 refused
6.7 mo
Median decision
UK 6 mo
52 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Fylde compares

Against the 137 UK authorities with 5+ battery storage decisions, Fylde sits in the 73rd percentile for approval rate (8 points above the England average) and the 39th percentile for speed.

Decisions by year

35Approved — 1 (2019)119Approved — 1 (2023)123Approved — 1 (2025)125
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (4)

SchemeMWStatusDecided
Lowland Farm, Peel Road - Battery Energy Storage Facility
Max Design Consultancy · 25/0371
100Application Submitted2025-06-26
West Moss Lane, Higher Ballam - Battery Energy Storage System
Lower 48 Energy BESS Limited · 24/0295 · 9.9 mo to decide
30Awaiting Construction2025-04-30
Peel Road - Battery Storage
Energi Generation · 23/0125 · 6.7 mo to decide
20Awaiting Construction2023-09-06
Clifton Marsh Waste Water Treatment Works
United Utilities · LCC/2019/0045 · 0.9 mo to decide
2Operational2019-08-28

Does Fylde approve battery storage schemes?

Yes — of the 3 battery storage schemes Fylde has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Fylde?

The median time from application to decision is 6.7 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Fylde consented?

52 MW has been consented across 3 approved schemes. A further 1 application awaits a decision.

Other technologies in Fylde

Solar in FyldeOnshore wind in Fylde

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report