Battery storage planning in Fareham

Fareham has decided 3 battery storage schemes and approved 100% of them, taking a median of 1.4 months to decide. Consented capacity: 80 MW.

100%
Approved
3 granted · 0 refused
1.4 mo
Median decision
UK 6 mo
80 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Fareham compares

Against the 137 UK authorities with 5+ battery storage decisions, Fareham sits in the 73rd percentile for approval rate (8 points above the England average) and the 100th percentile for speed.

Decisions by year

35Approved — 1 (2019)119Approved — 1 (2021)121Approved — 1 (2024)124
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (4)

SchemeMWStatusDecided
Bus Depot, Gosport Road - Battery Energy Storage
FirstBus (South) Limited · P/24/1007/FP · 0.8 mo to decide
Awaiting Construction2024-08-22
Newlands Farm Battery Storage Facility Phase 2
British Solar Renewables · P/20/1562/FP · 1.4 mo to decide
40Operational2021-01-26
Tanners Lane - Battery Energy Storage Facility (Phase One)
British Solar Renewables · P/19/1019/FP · 2.8 mo to decide
40Awaiting Construction2019-11-26
Peel Common Waste Water Treatment Works
Hampshire County Council (Southern Water/Enzygo) · P/17/0886/CC
20Abandoned2017-07-27

Does Fareham approve battery storage schemes?

Yes — of the 3 battery storage schemes Fareham has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Fareham?

The median time from application to decision is 1.4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Fareham consented?

80 MW has been consented across 3 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Fareham

Solar in FarehamOnshore wind in Fareham

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.