Renewable planning › Battery storage › Breckland
Battery storage planning in Breckland
Breckland has decided 3 battery storage schemes and approved 100% of them, taking a median of 4.9 months to decide. Consented capacity: 15 MW. 1 application still awaiting a decision.
⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Breckland compares
Against the 137 UK authorities with 5+ battery storage decisions, Breckland sits in the 73rd percentile for approval rate (8 points above the England average) and the 63rd percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (4)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Thetford Sports Centre - Battery Energy Storage Solution Parkwood Leisure Limited · PL/2025/0890/FMIN · 4 mo to decide | 0.22 | Awaiting Construction | 2025-10-20 |
The Park Farm, Birds Corner - Battery Energy Storage Regener8 Power Limited · PL/2025/0904/FMAJ | 800 | Application Submitted | 2025-06-23 |
Jafa, Great Dunham - Solar Photovoltaic Farm & Battery Storage Low Carbon UK Solar Investment Co Limited · 3PL/2022/1215/F · 5.1 mo to decide | — | Awaiting Construction | 2023-03-30 |
Three Bridges Solar Farm Pathfinder Clean Energy UK Dev Limited · 3PL/2020/1134/F · 4.9 mo to decide | 15 | Awaiting Construction | 2021-03-10 |
Does Breckland approve battery storage schemes?
Yes — of the 3 battery storage schemes Breckland has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Breckland?
The median time from application to decision is 4.9 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Breckland consented?
15 MW has been consented across 3 approved schemes. A further 1 application awaits a decision.
Other technologies in Breckland
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.