Novarly ParcelRenewable planning

Renewable planning Onshore windBreckland

Onshore wind planning in Breckland

Breckland has decided 6 onshore wind schemes and approved 67% of them, taking a median of 11.4 months to decide. Consented capacity: 22 MW. 1 application still awaiting a decision.

67%
Approved
4 granted · 2 refused
11.4 mo
Median decision
UK 11.5 mo
22 MW
Consented
17 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Breckland compares

Against the 75 UK authorities with 5+ onshore wind decisions, Breckland sits in the 45th percentile for approval rate (1 points below the England average) and the 65th percentile for speed.

Decisions by year

35Approved — 1 (2010)110Refused — 1 (2012)112
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (8)

SchemeMWStatusDecided
Washpit Drove
Airvolution Energy · 3PL/2014/0106/F
4.7Application Withdrawn2015-10-06
Shipdham Wind Park
Ecotricity · 3PL/2011/0854/F · 13.6 mo to decide
4.6Application Refused2012-09-20
North Pickenham Airfield
Bernard Matthews Green Energy · 3PL/2009/0881/F · 12.1 mo to decide
4Operational2010-09-24
Swaffham Extension
Ecotricity · 3/07/0314/F · 10.3 mo to decide
12Application Refused2008-03-06
North Pickenham
Foresight Group · 7 mo to decide
14.4Operational2004-10-01
Shipdham Wind Park
Ecotricity · 3PL/2002/0004 · 11.4 mo to decide
4Revised2002-12-17
Swaffham Plashes II
Ecotricity · 3PL/2001/1505/F · 9.6 mo to decide
1.8Operational2002-09-30
Swaffham 1 - Ecotech Wind Park
LRZ Ltd (Taken over by NOVERA) · 11.6 mo to decide
1.5Operational1999-02-19

Does Breckland approve onshore wind schemes?

Yes — of the 6 onshore wind schemes Breckland has decided, 67% were approved (4 granted, 2 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Breckland?

The median time from application to decision is 11.4 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Breckland consented?

22 MW has been consented across 4 approved schemes, with 17 MW refused. A further 1 application awaits a decision.

Other technologies in Breckland

Solar in BrecklandBattery storage in Breckland

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.