Bolton has decided 5 battery storage schemes and approved 100% of them, taking a median of 4.3 months to decide. Consented capacity: 57 MW. 1 application still awaiting a decision.

100%
Approved
5 granted · 0 refused
4.3 mo
Median decision
UK 6 mo
57 MW
Consented
across approved schemes
2
Appeals
1 allowed on appeal

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Bolton compares

Against the 137 UK authorities with 5+ battery storage decisions, Bolton sits in the 73rd percentile for approval rate (8 points above the England average) and the 71st percentile for speed.

Decisions by year

35Approved — 1 (2021)121Approved — 1 (2022)122Approved — 2 (2024)224Approved — 1 (2026)126
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Scot Lane - Micro Energy Storage System
AMP Clean Energy · 20945/25 · 4.7 mo to decide
0.2Application Granted2026-01-19
Slack Lane, Westhoughton - Battery Energy Storage System
Foundation Property & Capital Group · 18884/24 · 3.9 mo to decide
45Awaiting Construction2024-12-24
Ditchers Farm
Conrad Energy (Developments) Limited · 12461/21 · 27.7 mo to decide
Awaiting Construction2024-02-08
Stoneclough - Battery Energy Storage
GAM Capital Limited / Infinis Energy Services Limited · 13256/22 · 6.4 mo to decide
7Awaiting Construction2022-10-24
Union Court Storage Facility
Infinis Solar Developments Limited · 11821/21 · 2.7 mo to decide
4.8Awaiting Construction2021-10-12
Ditchers Farm
Asta Ventures · 01119/17 · 3.9 mo to decide
Revised2017-10-05

Does Bolton approve battery storage schemes?

Yes — of the 5 battery storage schemes Bolton has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Bolton?

The median time from application to decision is 4.3 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Bolton consented?

57 MW has been consented across 5 approved schemes. A further 1 application awaits a decision.

Other technologies in Bolton

Solar in BoltonOnshore wind in Bolton

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report