Renewable planning › Battery storage › Blackburn with Darwen
Battery storage planning in Blackburn with Darwen
Blackburn with Darwen has decided 3 battery storage schemes and approved 100% of them, taking a median of 6.9 months to decide. Consented capacity: 25 MW.
⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Blackburn with Darwen compares
Against the 137 UK authorities with 5+ battery storage decisions, Blackburn with Darwen sits in the 73rd percentile for approval rate (8 points above the England average) and the 36th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (3)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Gladstone Street, Little Harwood - Battery Energy Storage Facility Conrad Energy (Developments) Limited · 10/24/0208 · 1.9 mo to decide | — | Awaiting Construction | 2024-05-01 |
Davies Road - Whitebirk Battery Storage Field · 11/21/0483 · 6.9 mo to decide | 25 | Awaiting Construction | 2022-03-02 |
Balle Street STOR Power · 10/17/1198 · 48.9 mo to decide | — | Under Construction | 2021-11-05 |
Does Blackburn with Darwen approve battery storage schemes?
Yes — of the 3 battery storage schemes Blackburn with Darwen has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Blackburn with Darwen?
The median time from application to decision is 6.9 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Blackburn with Darwen consented?
25 MW has been consented across 3 approved schemes. There are no applications currently awaiting a decision.
Other technologies in Blackburn with Darwen
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com
Screen a specific site here · All authorities · UK property report