Onshore wind planning in Basingstoke and Deane

Basingstoke and Deane has decided 1 onshore wind scheme and approved 0% of them, taking a median of 12.4 months to decide.

0%
Approved
0 granted · 1 refused
12.4 mo
Median decision
UK 11.5 mo
0 MW
Consented
18 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Basingstoke and Deane compares

Against the 75 UK authorities with 5+ onshore wind decisions, Basingstoke and Deane sits in the 0th percentile for approval rate (68 points below the England average) and the 59th percentile for speed.

Every recorded scheme (1)

SchemeMWStatusDecided
Woodmancott Down
Woodmancott Wind Farm Ltd · 13/00844/FUL · 12.4 mo to decide
18Application Refused2014-06-26

Does Basingstoke and Deane approve onshore wind schemes?

Yes — of the 1 onshore wind schemes Basingstoke and Deane has decided, 0% were approved (0 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Basingstoke and Deane?

The median time from application to decision is 12.4 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Basingstoke and Deane consented?

0 MW has been consented across 0 approved schemes, with 18 MW refused. There are no applications currently awaiting a decision.

Other technologies in Basingstoke and Deane

Solar in Basingstoke and DeaneBattery storage in Basingstoke and Deane

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.