Torbay Leisure Centre - Energy Project is a 0.17 MW solar farm under construction in Torbay. Planning permission was granted on 11 March 2022, 1 months after submission. Operator of record: Leisure Energy.

0.17 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Leisure Energy
Torbay
Authority
England

Planning and build timeline

Application submitted3 February 2022
Permission granted11 March 2022
1 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Torbay: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Torbay Leisure Centre - Energy Project’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
38.6 km
Solar Photovoltaics · Operational
1210.4 km
Solar Photovoltaics · Operational
510.6 km
Solar Photovoltaics · Operational
511.9 km
Solar Photovoltaics · Operational
6.413.9 km
Solar Photovoltaics · Operational
4.914.7 km
Solar Photovoltaics · Operational
814.9 km

How big is Torbay Leisure Centre - Energy Project?

Torbay Leisure Centre - Energy Project has a recorded installed capacity of 0.17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Torbay Leisure Centre - Energy Project?

REPD records the operator as Leisure Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Torbay Leisure Centre - Energy Project approved and built?

The application was submitted on 3 February 2022. Permission was granted on 11 March 2022, 1 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10654.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode