Shetland Tidal Array

Shetland Tidal Array is an operational 0.5 MW tidal stream array in Scotland, generating since 24 June 2019. REPD does not record the planning grant date. Operator of record: Nova Innovation.

0.5 MW
Capacity
as recorded in REPD
Operational
Status
since 24 June 2019
Tidal Stream
Technology
Nova Innovation
National
Authority
Scotland

Planning and build timeline

Application submitted1 February 2018
Permission grantednot recorded
Operational24 June 2019

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Shetland Tidal Array’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Tidal Stream · Operational
1.40 km

How big is Shetland Tidal Array?

Shetland Tidal Array has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Shetland Tidal Array?

REPD records the operator as Nova Innovation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Shetland Tidal Array approved and built?

The application was submitted on 1 February 2018. REPD does not record a grant date. The site became operational on 24 June 2019.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6637.