Rampion Offshore Wind Farm (Hastings Zone)

Rampion Offshore Wind Farm (Hastings Zone) is an operational 400 MW offshore wind farm in England, generating since 26 November 2017. Planning permission was granted on 16 July 2014, 16 months after submission. Operator of record: E.ON UK.

400 MW
Capacity
as recorded in REPD
Operational
Status
since 26 November 2017
Wind Offshore
Technology
E.ON UK
National
Authority
England

Planning and build timeline

Application submitted25 March 2013
Permission granted16 July 2014
16 months after submission
Operational26 November 2017
40 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Rampion Offshore Wind Farm (Hastings Zone)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

How big is Rampion Offshore Wind Farm (Hastings Zone)?

Rampion Offshore Wind Farm (Hastings Zone) has a recorded installed capacity of 400 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rampion Offshore Wind Farm (Hastings Zone)?

REPD records the operator as E.ON UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rampion Offshore Wind Farm (Hastings Zone) approved and built?

The application was submitted on 25 March 2013. Permission was granted on 16 July 2014, 16 months later. The site became operational on 26 November 2017, 40 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2520.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode