Renewable sitesPlascow wind cluster

Plascow wind cluster

Plascow wind cluster is an operational 2.4 MW onshore wind farm in Dumfries and Galloway, generating since 15 July 2015. Planning permission was granted on 27 March 2014, 11 months after submission. Operator of record: Private Developer.

2.4 MW
Capacity
as recorded in REPD
Operational
Status
since 15 July 2015
Wind Onshore
Technology
Private Developer
Dumfries and Galloway
Authority
Scotland

Planning and build timeline

Application submitted9 May 2013
Permission granted27 March 2014
11 months after submission
Operational15 July 2015
16 months after consent

Screening a site of your own?

RedlineUK · £39

Dumfries and Galloway approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Plascow wind cluster’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Dumfries and Galloway’s record on onshore wind

Dumfries and Galloway has decided 55 onshore wind schemes and approved 67%, taking a median of 18.5 months. See every onshore wind scheme decision in Dumfries and Galloway

How big is Plascow wind cluster?

Plascow wind cluster has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Plascow wind cluster?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Plascow wind cluster approved and built?

The application was submitted on 9 May 2013. Permission was granted on 27 March 2014, 11 months later. The site became operational on 15 July 2015, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4484.