Novarly ParcelRenewable sites

Renewable sitesNeart na Gaoithe

Neart na Gaoithe

Neart na Gaoithe is operational in Scotland with a recorded capacity of 450 MW, and has been generating since 2025-07-01.

450 MW
Capacity
as recorded in REPD
Operational
Status
since 2025-07-01
Wind Offshore
Technology
EDF Renewables Power
National
Authority
Scotland

Planning and build timeline

Application submitted2012-07-30
Permission granted2017-05-16
58 months after submission
Operational2025-07-01
98 months after consent

How big is Neart na Gaoithe?

Neart na Gaoithe has a recorded installed capacity of 450 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Neart na Gaoithe?

REPD records the operator as EDF Renewables Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Neart na Gaoithe approved and built?

The application was submitted on 2012-07-30. Permission was granted on 2017-05-16, 58 months later. The site became operational on 2025-07-01, 98 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2522.