Novarly ParcelRenewable sites

Renewable sitesManor Farm Solar Panels

Manor Farm Solar Panels

Manor Farm Solar Panels is under construction in Herefordshire, County of with a recorded capacity of 0.3 MW.

0.3 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Manor Farm
Herefordshire, County of
Authority
England

Planning and build timeline

Application submitted2020-12-02
Permission granted2021-02-18
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Herefordshire, County of’s record on solar

Herefordshire, County of has decided 25 solar farms and approved 80%, taking a median of 3 months. See every solar farm decision in Herefordshire, County of

How big is Manor Farm Solar Panels?

Manor Farm Solar Panels has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Manor Farm Solar Panels?

REPD records the operator as Manor Farm. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Manor Farm Solar Panels approved and built?

The application was submitted on 2020-12-02. Permission was granted on 2021-02-18, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8259.

Novarly Parcel · official public data, read properly · parcel.novarly.com