Maldie Burn is operational in Highland with a recorded capacity of 4 MW, and has been generating since 2014-03-01.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-01
Small Hydro
Technology
RWE npower
Highland
Authority
Scotland

Planning and build timeline

Application submitted2009-06-11
Permission granted2011-01-17
19 months after submission
Operational2014-03-01
37 months after consent

How big is Maldie Burn?

Maldie Burn has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Maldie Burn?

REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Maldie Burn approved and built?

The application was submitted on 2009-06-11. Permission was granted on 2011-01-17, 19 months later. The site became operational on 2014-03-01, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 484.