Renewable sitesInner Sound Phase 1A (MeyGen)

Inner Sound Phase 1A (MeyGen)

Inner Sound Phase 1A (MeyGen) is an operational 6 MW tidal stream array in Scotland, generating since 20 February 2017. Planning permission was granted on 16 September 2013, 14 months after submission. Operator of record: Atlantis Resources.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 20 February 2017
Tidal Stream
Technology
Atlantis Resources
National
Authority
Scotland

Planning and build timeline

Application submitted19 July 2012
Permission granted16 September 2013
14 months after submission
Operational20 February 2017
41 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Inner Sound Phase 1A (MeyGen)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
29.5 km
Wind Onshore · Operational
1.811.1 km
Shoreline Wave · Operational
112.1 km

How big is Inner Sound Phase 1A (MeyGen)?

Inner Sound Phase 1A (MeyGen) has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Inner Sound Phase 1A (MeyGen)?

REPD records the operator as Atlantis Resources. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Inner Sound Phase 1A (MeyGen) approved and built?

The application was submitted on 19 July 2012. Permission was granted on 16 September 2013, 14 months later. The site became operational on 20 February 2017, 41 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2436.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode