Galloper Wind Farm is an operational 353 MW offshore wind farm in England, generating since 30 March 2018. Planning permission was granted on 24 May 2013, 18 months after submission. Operator of record: RWE Npower Renewables.

353 MW
Capacity
as recorded in REPD
Operational
Status
since 30 March 2018
Wind Offshore
Technology
RWE Npower Renewables
National
Authority
England

Planning and build timeline

Application submitted21 November 2011
Permission granted24 May 2013
18 months after submission
Operational30 March 2018
58 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Galloper Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Offshore · Operational
5048.7 km

How big is Galloper Wind Farm?

Galloper Wind Farm has a recorded installed capacity of 353 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Galloper Wind Farm?

REPD records the operator as RWE Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Galloper Wind Farm approved and built?

The application was submitted on 21 November 2011. Permission was granted on 24 May 2013, 18 months later. The site became operational on 30 March 2018, 58 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2526.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode