Renewable sites › Dundrinne Road
Dundrinne Road
Dundrinne Road is an operational 0.2 MW onshore wind farm in Newry, Mourne and Down. Planning permission was granted on 7 October 2019, 3 months after submission. Operator of record: Private Developer.
Planning and build timeline
| Application submitted | 10 July 2019 |
| Permission granted | 7 October 2019 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Newry, Mourne and Down approves 100% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Dundrinne Road’s recorded coordinate — swap in your own postcode or coordinates.
Newry, Mourne and Down’s record on onshore wind
Newry, Mourne and Down has decided 5 onshore wind schemes and approved 100%, taking a median of 16 months. See every onshore wind scheme decision in Newry, Mourne and Down →
How big is Dundrinne Road?
Dundrinne Road has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dundrinne Road?
REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dundrinne Road approved and built?
The application was submitted on 10 July 2019. Permission was granted on 7 October 2019, 3 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7544.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode