Dounreay Tr� Floating Wind Demonstration

Dounreay Tr� Floating Wind Demonstration is under construction in Scotland with a recorded capacity of 10 MW.

10 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Offshore
Technology
Hexicon AB/ Dounreay Tri
National
Authority
Scotland

Planning and build timeline

Application submitted2016-10-17
Permission granted2017-03-16
5 months after submission
Operationalnot recorded

How big is Dounreay Tr� Floating Wind Demonstration?

Dounreay Tr� Floating Wind Demonstration has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dounreay Tr� Floating Wind Demonstration?

REPD records the operator as Hexicon AB/ Dounreay Tri. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dounreay Tr� Floating Wind Demonstration approved and built?

The application was submitted on 2016-10-17. Permission was granted on 2017-03-16, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6264.