Novarly ParcelRenewable sites

Renewable sitesDogger Bank C (was Teesside A)

Dogger Bank C (was Teesside A)

Dogger Bank C (was Teesside A) is under construction in England with a recorded capacity of 1.20 GW.

1.20 GW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Offshore
Technology
SSE/Equinor (formerly Statoil, formerly Forewind)
National
Authority
England

Planning and build timeline

Application submitted2014-03-28
Permission granted2015-08-05
16 months after submission
Operationalnot recorded

What this site sits on

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Sofia (Teesside B)
Wind Offshore · Under Construction
14000 km

How big is Dogger Bank C (was Teesside A)?

Dogger Bank C (was Teesside A) has a recorded installed capacity of 1.20 GW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dogger Bank C (was Teesside A)?

REPD records the operator as SSE/Equinor (formerly Statoil, formerly Forewind). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dogger Bank C (was Teesside A) approved and built?

The application was submitted on 2014-03-28. Permission was granted on 2015-08-05, 16 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2517.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council