Renewable sites › Dogger Bank A & B (was Creyke Beck A & B)
Dogger Bank A & B (was Creyke Beck A & B)
Dogger Bank A & B (was Creyke Beck A & B) is a 2.40 GW offshore wind farm under construction in England. Planning permission was granted on 17 February 2015, 18 months after submission. Operator of record: SSE/Equinor (formerly Statoil, formerly Forewind).
Planning and build timeline
| Application submitted | 29 August 2013 |
| Permission granted | 17 February 2015 18 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Dogger Bank A & B (was Creyke Beck A & B)’s recorded coordinate — swap in your own postcode or coordinates.
How big is Dogger Bank A & B (was Creyke Beck A & B)?
Dogger Bank A & B (was Creyke Beck A & B) has a recorded installed capacity of 2.40 GW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dogger Bank A & B (was Creyke Beck A & B)?
REPD records the operator as SSE/Equinor (formerly Statoil, formerly Forewind). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dogger Bank A & B (was Creyke Beck A & B) approved and built?
The application was submitted on 29 August 2013. Permission was granted on 17 February 2015, 18 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2541.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode