Novarly ParcelRenewable sites

Renewable sitesCwm Dyli

Cwm Dyli

Cwm Dyli is operational in Gwynedd with a recorded capacity of 9.9 MW, and has been generating since 1906-01-01.

9.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1906-01-01
Large Hydro
Technology
RWE
Gwynedd
Authority
Wales

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1906-01-01

Other built sites within 15 km

SiteMWDistance
Ffestiniog
Pumped Storage Hydroelectricity · Operational
3608.1 km
Dinorwig
Pumped Storage Hydroelectricity · Operational
172810 km

How big is Cwm Dyli?

Cwm Dyli has a recorded installed capacity of 9.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cwm Dyli?

REPD records the operator as RWE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cwm Dyli approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1906-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4882.

Novarly Parcel · official public data, read properly · parcel.novarly.com