Combe Gill Hydro Station

Combe Gill Hydro Station is a 0.2 MW hydro scheme under construction in Cumberland. REPD does not record the planning grant date. Operator of record: National Trust/Ellergreen Hydro.

0.2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Small Hydro
Technology
National Trust/Ellergreen Hydro
Cumberland
Authority
England

Planning and build timeline

Application submitted10 April 2018
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Cumberland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Combe Gill Hydro Station’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

How big is Combe Gill Hydro Station?

Combe Gill Hydro Station has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Combe Gill Hydro Station?

REPD records the operator as National Trust/Ellergreen Hydro. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Combe Gill Hydro Station approved and built?

The application was submitted on 10 April 2018. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6778.