Novarly ParcelRenewable sites

Renewable sitesColsterworth Landfill Gas Project

Colsterworth Landfill Gas Project

Colsterworth Landfill Gas Project is an operational 2.6 MW landfill gas site in South Kesteven, generating since 31 March 2001. Planning permission was granted on 31 January 2000, 10 months after submission. Operator of record: Colsterworth Energy Ltd.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2001
Landfill Gas
Technology
Colsterworth Energy Ltd
South Kesteven
Authority
England

Planning and build timeline

Application submitted5 April 1999
Permission granted31 January 2000
10 months after submission
Operational31 March 2001
14 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in South Kesteven: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Colsterworth Landfill Gas Project’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
59.2 km

How big is Colsterworth Landfill Gas Project?

Colsterworth Landfill Gas Project has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Colsterworth Landfill Gas Project?

REPD records the operator as Colsterworth Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Colsterworth Landfill Gas Project approved and built?

The application was submitted on 5 April 1999. Permission was granted on 31 January 2000, 10 months later. The site became operational on 31 March 2001, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 530.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode