Colsterworth Landfill Gas Project

Colsterworth Landfill Gas Project is operational in South Kesteven with a recorded capacity of 2.6 MW, and has been generating since 2001-03-31.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-03-31
Landfill Gas
Technology
Colsterworth Energy Ltd
South Kesteven
Authority
England

Planning and build timeline

Application submitted1999-04-05
Permission granted2000-01-31
10 months after submission
Operational2001-03-31
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
High Dyke (Mill Farm)
Solar Photovoltaics · Operational
59.2 km

How big is Colsterworth Landfill Gas Project?

Colsterworth Landfill Gas Project has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Colsterworth Landfill Gas Project?

REPD records the operator as Colsterworth Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Colsterworth Landfill Gas Project approved and built?

The application was submitted on 1999-04-05. Permission was granted on 2000-01-31, 10 months later. The site became operational on 2001-03-31, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 530.