Cnocbreac Inver Estate - Solar Generation

Cnocbreac Inver Estate - Solar Generation is a 2.1 MW solar farm under construction in Argyll and Bute. Planning permission was granted on 28 October 2024, 3 months after submission. Operator of record: Inver Hydro Limited.

2.1 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Inver Hydro Limited
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted7 August 2024
Permission granted28 October 2024
3 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Argyll and Bute: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Cnocbreac Inver Estate - Solar Generation’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
29.1 km

How big is Cnocbreac Inver Estate - Solar Generation?

Cnocbreac Inver Estate - Solar Generation has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cnocbreac Inver Estate - Solar Generation?

REPD records the operator as Inver Hydro Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cnocbreac Inver Estate - Solar Generation approved and built?

The application was submitted on 7 August 2024. Permission was granted on 28 October 2024, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15481.