Renewable sites › Cnocbreac Inver Estate - Solar Generation
Cnocbreac Inver Estate - Solar Generation
Cnocbreac Inver Estate - Solar Generation is a 2.1 MW solar farm under construction in Argyll and Bute. Planning permission was granted on 28 October 2024, 3 months after submission. Operator of record: Inver Hydro Limited.
Planning and build timeline
| Application submitted | 7 August 2024 |
| Permission granted | 28 October 2024 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Argyll and Bute: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Cnocbreac Inver Estate - Solar Generation’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Small Hydro · Operational | 2 | 9.1 km |
How big is Cnocbreac Inver Estate - Solar Generation?
Cnocbreac Inver Estate - Solar Generation has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cnocbreac Inver Estate - Solar Generation?
REPD records the operator as Inver Hydro Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cnocbreac Inver Estate - Solar Generation approved and built?
The application was submitted on 7 August 2024. Permission was granted on 28 October 2024, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15481.