Novarly ParcelRenewable sites

Renewable sitesArdtornish Estate-Upgrade to existing

Ardtornish Estate-Upgrade to existing

Ardtornish Estate-Upgrade to existing is an operational 1.5 MW hydro scheme in Scotland, generating since 20 December 2012. Planning permission was granted on 18 May 2009, 8 months after submission. Operator of record: Ardtornish Estate.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 20 December 2012
Small Hydro
Technology
Ardtornish Estate
National
Authority
Scotland

Planning and build timeline

Application submitted10 September 2008
Permission granted18 May 2009
8 months after submission
Operational20 December 2012
43 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ardtornish Estate-Upgrade to existing’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
3.512 km
Small Hydro · Operational
1.714.9 km

How big is Ardtornish Estate-Upgrade to existing?

Ardtornish Estate-Upgrade to existing has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ardtornish Estate-Upgrade to existing?

REPD records the operator as Ardtornish Estate. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ardtornish Estate-Upgrade to existing approved and built?

The application was submitted on 10 September 2008. Permission was granted on 18 May 2009, 8 months later. The site became operational on 20 December 2012, 43 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 482.

Novarly Parcel · official public data, read properly · parcel.novarly.com