Solar planning in Woking

Woking has decided 6 solar farms and approved 100% of them, taking a median of 1.7 months to decide. Consented capacity: 5 MW.

100%
Approved
6 granted · 0 refused
1.7 mo
Median decision
UK 2.3 mo
5 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Woking compares

Against the 298 UK authorities with 5+ solar decisions, Woking sits in the 77th percentile for approval rate (7 points above the England average) and the 87th percentile for speed.

Decisions by year

35Approved — 1 (2021)121Approved — 1 (2023)123Approved — 2 (2024)224Approved — 2 (2025)225
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Mclaren Technology Centre, Chertsey Road - Solar Panels
McLaren Group Limited · PLAN/2025/0678 · 2.8 mo to decide
2.56Awaiting Construction2025-11-18
Big Yellow Byfleet, Oyster Lane - Solar Panels
Big Yellow Group Plc · PLAN/2025/0659 · 1.7 mo to decide
0.18Awaiting Construction2025-10-03
Kestrel Way - Solar Panels
Digital Realty · PLAN/2024/0010 · 1.6 mo to decide
1.47Awaiting Construction2024-03-06
West Byfleet Consulting Rooms, Madeira Road - Solar panels
West Byfleet Health Centre · PLAN/2024/0030 · 1.6 mo to decide
0.16Awaiting Construction2024-03-04
David Lloyd Leisure, Westfield Avenue - Solar Panels
David Lloyd Leisure Limited · PLAN/2023/0415 · 2.7 mo to decide
Awaiting Construction2023-06-27
Guildford Road - Solar Array
Surrey County Council · PLAN/2021/0792 · 1.7 mo to decide
0.27Awaiting Construction2021-08-25

Does Woking approve solar farms?

Yes — of the 6 solar farms Woking has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Woking?

The median time from application to decision is 1.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Woking consented?

5 MW has been consented across 6 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Woking

Battery storage in WokingOnshore wind in Woking

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.