Renewable planning › Solar › Woking
Solar planning in Woking
Woking has decided 6 solar farms and approved 100% of them, taking a median of 1.7 months to decide. Consented capacity: 5 MW.
⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Woking compares
Against the 298 UK authorities with 5+ solar decisions, Woking sits in the 77th percentile for approval rate (7 points above the England average) and the 87th percentile for speed.
Decisions by year
Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (6)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Mclaren Technology Centre, Chertsey Road - Solar Panels McLaren Group Limited · PLAN/2025/0678 · 2.8 mo to decide | 2.56 | Awaiting Construction | 2025-11-18 |
Big Yellow Byfleet, Oyster Lane - Solar Panels Big Yellow Group Plc · PLAN/2025/0659 · 1.7 mo to decide | 0.18 | Awaiting Construction | 2025-10-03 |
Kestrel Way - Solar Panels Digital Realty · PLAN/2024/0010 · 1.6 mo to decide | 1.47 | Awaiting Construction | 2024-03-06 |
West Byfleet Consulting Rooms, Madeira Road - Solar panels West Byfleet Health Centre · PLAN/2024/0030 · 1.6 mo to decide | 0.16 | Awaiting Construction | 2024-03-04 |
David Lloyd Leisure, Westfield Avenue - Solar Panels David Lloyd Leisure Limited · PLAN/2023/0415 · 2.7 mo to decide | — | Awaiting Construction | 2023-06-27 |
Guildford Road - Solar Array Surrey County Council · PLAN/2021/0792 · 1.7 mo to decide | 0.27 | Awaiting Construction | 2021-08-25 |
Does Woking approve solar farms?
Yes — of the 6 solar farms Woking has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a solar farm application take in Woking?
The median time from application to decision is 1.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much solar capacity has Woking consented?
5 MW has been consented across 6 approved schemes. There are no applications currently awaiting a decision.
Other technologies in Woking
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.