Novarly ParcelRenewable planning

Renewable planning SolarWaverley

Solar planning in Waverley

Waverley has decided 6 solar farms and approved 100% of them, taking a median of 3 months to decide. Consented capacity: 5 MW. 2 applications still awaiting a decision.

100%
Approved
6 granted · 0 refused
3 mo
Median decision
UK 2.3 mo
5 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Waverley compares

Against the 298 UK authorities with 5+ solar decisions, Waverley sits in the 77th percentile for approval rate (7 points above the England average) and the 32nd percentile for speed.

Decisions by year

35Approved — 1 (2011)111Approved — 1 (2022)122Approved — 3 (2023)323Approved — 1 (2024)124
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (8)

SchemeMWStatusDecided
Sainsburys, Woolsack Way - Solar Panels
Sainsburys Supermarkets Limited · PRA/2024/01524 · 1.8 mo to decide
0.63Awaiting Construction2024-10-02
Tuesley Farm, Tuesley Lane - Solar Array
Hall Hunter Partnership · WA/2023/01667 · 4.1 mo to decide
1Awaiting Construction2023-11-29
David Lloyd Leisure Club, Wilkinson Way - Solar PV Panels
David Lloyd Leisure Limited · PRA/2023/01553 · 1.9 mo to decide
0.33Awaiting Construction2023-09-14
University For The Creative Arts, Falkner Road - Solar PV Panels
University for the Creative Arts · PRA/2023/01638 · 1.6 mo to decide
0.57Awaiting Construction2023-09-13
Brightwells Road - Solar Panels
Crest Nicholson Operations Limited · WA/2022/01773 · 4.5 mo to decide
0.33Awaiting Construction2022-11-16
Kinetrol Manufacturing,Farnham Trading Estate - Solar Panels
Kinetrol Limited · PRA/2022/02509
0.24Application Submitted2022-10-10
Kinetrol Manufacturing - Solar PV Panels
Kinetrol Limited · PRA/2021/01298
0.27Revised2021-05-28
Dunsfold Park Solar Farm
Dunsfold Park Ltd · WA/2010/1904 · 4.8 mo to decide
2Operational2011-03-30

Does Waverley approve solar farms?

Yes — of the 6 solar farms Waverley has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Waverley?

The median time from application to decision is 3 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Waverley consented?

5 MW has been consented across 6 approved schemes. A further 2 applications awaits a decision.

Other technologies in Waverley

Battery storage in WaverleyOnshore wind in Waverley

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.