Solar planning in Stevenage

Stevenage has decided 7 solar farms and approved 100% of them, taking a median of 1.5 months to decide. Consented capacity: 2 MW. 2 applications still awaiting a decision.

100%
Approved
7 granted · 0 refused
1.5 mo
Median decision
UK 2.3 mo
2 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (7 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Stevenage compares

Against the 298 UK authorities with 5+ solar decisions, Stevenage sits in the 77th percentile for approval rate (7 points above the England average) and the 95th percentile for speed.

Decisions by year

35Approved — 1 (2019)119Approved — 1 (2020)120Approved — 1 (2022)122Approved — 2 (2023)223Approved — 2 (2025)225
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
Tesco Extra, The Forum - Solar Panels
Batchelor Electrical Limited · 26/00163/CPAS
0.26Application Submitted2026-02-17
Unit 1, Roebuck Retail Park, London Road - Solar Panels
Advanced Renewable Power Limited · 25/00422/CPAS · 1.3 mo to decide
0.16Awaiting Construction2025-07-11
Aston End - Ground Mounted Solar Panels
Myriad Heat & Power Products Limited · 3/25/0950/FUL
0.24Application Submitted2025-07-09
Sainsburys, Hitchin Road - Solar Panels
Sainsburys Supermarkets Limited · 25/00087/CPAS · 1.5 mo to decide
0.31Awaiting Construction2025-03-17
David Lloyd Fitness Centre, Kings Way - Solar Panels
David Lloyd Leisure Limited · 23/00455/CPAS · 1.4 mo to decide
Awaiting Construction2023-07-27
Roaring Meg Retail Park, London Road - Solar Panels
TK Maxx · 23/00050/CPAS · 1.4 mo to decide
0.29Awaiting Construction2023-03-02
Stevenage Leisure Park, Kings Way - Solar PV Panels
Hollywood Bowl Group · 21/01324/CPAS · 1.7 mo to decide
0.22Awaiting Construction2022-04-05
Tesco Store The Forum Stevenage
Push Energy · 20/00015/CPAS · 1.8 mo to decide
0.4Awaiting Construction2020-03-06
Flamingo House
M & G · 19/00216/CPAS · 6 mo to decide
1Operational2019-10-07

Does Stevenage approve solar farms?

Yes — of the 7 solar farms Stevenage has decided, 100% were approved (7 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Stevenage?

The median time from application to decision is 1.5 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Stevenage consented?

2 MW has been consented across 7 approved schemes. A further 2 applications awaits a decision.

Other technologies in Stevenage

Battery storage in StevenageOnshore wind in Stevenage

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report