Solar planning in Southwark

Southwark has decided 6 solar farms and approved 100% of them, taking a median of 4.5 months to decide. Consented capacity: 2 MW. 3 applications still awaiting a decision.

100%
Approved
6 granted · 0 refused
4.5 mo
Median decision
UK 2.3 mo
2 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Southwark compares

Against the 298 UK authorities with 5+ solar decisions, Southwark sits in the 77th percentile for approval rate (7 points above the England average) and the 11th percentile for speed.

Decisions by year

35Approved — 1 (2020)120Approved — 1 (2022)122Approved — 1 (2023)123Approved — 2 (2024)224Approved — 1 (2025)125
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
Peckham Pulse Leisure Centre, Melon Road - Solar Panels
London Borough of Southwark · 24/AP/3458 · 1.3 mo to decide
0.23Awaiting Construction2025-01-06
Dulwich College, College Road - Solar panels
Dulwich College · 24/AP/1656 · 6.3 mo to decide
0.66Awaiting Construction2024-12-20
Walworth Academy, Shorncliffe Road - Solar Panels
Solar Options for Schools Limited · 23/AP/3597 · 1.3 mo to decide
0.26Awaiting Construction2024-01-31
William Booth Training College, Champion Park - Solar Panels
The Salvation Army Trustee Company · 23/AP/0400 · 6.2 mo to decide
Awaiting Construction2023-08-29
William Booth Training College, Champion Park - Solar Panels
The Salvation Army Trustee Company · 23/AP/1938
Application Submitted2023-07-17
City Of London Academy - Solar PV Panels
Repowering · 22/AP/0393 · 2.8 mo to decide
0.19Awaiting Construction2022-05-20
City Of London Academy - Solar PV Panels
Repowering · 21/AP/4600
Revised2022-01-11
City Of London Academy - Solar Panels
Repowering · 21/AP/3696
Revised2021-11-11
The Bermondsey Project
Greystar Europe Holdings Limited · 17/AP/4088 · 31.3 mo to decide
0.24Awaiting Construction2020-06-04

Does Southwark approve solar farms?

Yes — of the 6 solar farms Southwark has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Southwark?

The median time from application to decision is 4.5 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Southwark consented?

2 MW has been consented across 6 approved schemes. A further 3 applications awaits a decision.

Other technologies in Southwark

Battery storage in SouthwarkOnshore wind in Southwark

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.