Solar planning in Redbridge

Redbridge has decided 6 solar farms and approved 100% of them, taking a median of 1.4 months to decide. Consented capacity: 2 MW. 3 applications still awaiting a decision.

100%
Approved
6 granted · 0 refused
1.4 mo
Median decision
UK 2.3 mo
2 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Redbridge compares

Against the 298 UK authorities with 5+ solar decisions, Redbridge sits in the 77th percentile for approval rate (7 points above the England average) and the 97th percentile for speed.

Decisions by year

35Approved — 1 (2022)122Approved — 1 (2023)123Approved — 2 (2024)224Approved — 2 (2025)225
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
King George Hospital, Barley Lane - Solar Photovoltaic Panels
King George Hospital · 3462/25
0.77Application Submitted2026-01-21
Redbridge Institute Of Adult Education, Gaysham Avenue - Solar Panels
Redbridge Institute of Adult Education · 2205/25 · 1 mo to decide
0.15Awaiting Construction2025-10-01
Maybank Road - Solar Panels
Dewhurst Group Plc · 2061/25 · 0.9 mo to decide
0.16Awaiting Construction2025-08-14
The Exchange Mall, High Road - Solar Panels
Capital & Regional Plc · 2769/24 · 1.4 mo to decide
0.68Awaiting Construction2024-11-22
Spire London East Hospital, Roding Lane South - Solar Panels
Spire Roding Hospital · 2100/24 · 1.3 mo to decide
0.17Awaiting Construction2024-09-04
Spire London East Hospital, Roding Lane South - Solar Panels
Spire Roding Hospital · 1510/24 · 1.5 mo to decide
0.17Revised2024-07-17
Spire London East Hospital, Roding Lane South - Solar Panels
Spire Roding Hospital · 0594/24 · 1.4 mo to decide
0.17Revised2024-04-18
Churchfields Junior School, Churchfields - Solar Panels
Solar Options for Schools Limited · 2066/23 · 1.8 mo to decide
0.17Awaiting Construction2023-10-24
Roding Lane South - Solar Panels
Interlink Direct · 3477/22 · 1.8 mo to decide
0.22Awaiting Construction2022-12-12

Does Redbridge approve solar farms?

Yes — of the 6 solar farms Redbridge has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Redbridge?

The median time from application to decision is 1.4 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Redbridge consented?

2 MW has been consented across 6 approved schemes. A further 3 applications awaits a decision.

Other technologies in Redbridge

Battery storage in RedbridgeOnshore wind in Redbridge

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.