Solar planning in Oadby and Wigston

Oadby and Wigston has decided 5 solar farms and approved 100% of them, taking a median of 3.2 months to decide. Consented capacity: 5 MW.

100%
Approved
5 granted · 0 refused
3.2 mo
Median decision
UK 2.3 mo
5 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Oadby and Wigston compares

Against the 298 UK authorities with 5+ solar decisions, Oadby and Wigston sits in the 77th percentile for approval rate (7 points above the England average) and the 27th percentile for speed.

Decisions by year

35Approved — 1 (2015)115Approved — 1 (2020)120Approved — 1 (2024)124Approved — 2 (2025)225
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (5)

SchemeMWStatusDecided
Parklands Leisure Centre, Washbrook Lane - Solar Panels
Leisure Energy Limited · 25/00101/PT14J · 3 mo to decide
0.19Awaiting Construction2025-07-01
Spire Leicester Hospital, Gartree Road - Solar Panels
Spire Healthcare Group PLC · 24/00199/FUL · 6.6 mo to decide
0.84Awaiting Construction2025-06-17
Wigston Swimming Pool, Station Road - Solar Panels
Oadby & Wigston Borough Council · 24/00380/PT14J · 1 mo to decide
0.21Awaiting Construction2024-11-08
Harborough Road Store
Lidl UK · 19/00513/FUL · 3.9 mo to decide
0.2Operational2020-04-16
Blaby Solar Farm
Blaby Solar Farm · 15/00327/FUL · 3.2 mo to decide
3.5Operational2015-11-13

Does Oadby and Wigston approve solar farms?

Yes — of the 5 solar farms Oadby and Wigston has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Oadby and Wigston?

The median time from application to decision is 3.2 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Oadby and Wigston consented?

5 MW has been consented across 5 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Oadby and Wigston

Battery storage in Oadby and WigstonOnshore wind in Oadby and Wigston

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.