Solar planning in North Tyneside

North Tyneside has decided 8 solar farms and approved 100% of them, taking a median of 1.6 months to decide. Consented capacity: 33 MW. 2 applications still awaiting a decision.

100%
Approved
8 granted · 0 refused
1.6 mo
Median decision
UK 2.3 mo
33 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

How North Tyneside compares

Against the 298 UK authorities with 5+ solar decisions, North Tyneside sits in the 77th percentile for approval rate (7 points above the England average) and the 92nd percentile for speed.

Decisions by year

35Approved — 1 (2021)121Approved — 4 (2023)423Approved — 1 (2024)124Approved — 2 (2025)225
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (10)

SchemeMWStatusDecided
North Gosforth Academy, Dudley Lane - Solar Panels
Solar Options for Schools Limited · 26/00431/PRIOTH
0.43Application Submitted2026-03-26
Quorum Building, Benton Lane - Solar Panels
TDR Training · 26/00144/PRIOTH
0.2Application Submitted2026-02-02
Border Control Post, Coble Dene - Solar Panels
Advanced Renewable Power Limited · 25/00977/PRIOTH · 1.8 mo to decide
0.25Awaiting Construction2025-09-17
Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV system
Entek International Limited · 25/00231/GDO · 1.7 mo to decide
1.4Awaiting Construction2025-04-16
Soil Machine Dynamic, Davy Bank - Solar Panels
North Tyneside Borough Council · ST/0071/24/AAA · 0.7 mo to decide
0.16Awaiting Construction2024-02-28
Unit C, Merlin Way - Solar Panels
Columbia Threadneedle Investments · 23/01346/GDO · 1.6 mo to decide
0.53Awaiting Construction2023-12-01
Unit A, Merlin Way - Solar Panels
Columbia Threadneedle Investments · 23/01348/GDO · 1.6 mo to decide
0.68Awaiting Construction2023-12-01
Unit B, Merlin Way - Solar Panels
Columbia Threadneedle Investments Limited · 23/01345/GDO · 1.6 mo to decide
0.66Awaiting Construction2023-11-30
Backworth Lane, Backworth - Solar Farm
Northumberland Estates · 22/02106/FUL · 5.5 mo to decide
28Awaiting Construction2023-05-09
North Tyneside General Hospital - Solar Panels
Breathe Energy Limited · 21/01995/GDO · 1.8 mo to decide
0.98Awaiting Construction2021-11-04

Does North Tyneside approve solar farms?

Yes — of the 8 solar farms North Tyneside has decided, 100% were approved (8 granted, 0 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in North Tyneside?

The median time from application to decision is 1.6 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has North Tyneside consented?

33 MW has been consented across 8 approved schemes. A further 2 applications awaits a decision.

Other technologies in North Tyneside

Battery storage in North TynesideOnshore wind in North Tyneside

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.