Ipswich has decided 6 solar farms and approved 100% of them, taking a median of 1.7 months to decide. Consented capacity: 2 MW.

100%
Approved
6 granted · 0 refused
1.7 mo
Median decision
UK 2.3 mo
2 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Ipswich compares

Against the 298 UK authorities with 5+ solar decisions, Ipswich sits in the 77th percentile for approval rate (7 points above the England average) and the 87th percentile for speed.

Decisions by year

35Approved — 1 (2022)122Approved — 2 (2023)223Approved — 1 (2024)124Approved — 2 (2025)225
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
David Lloyd Leisure - Solar panels
David Lloyd Leisure · 25/00563/P3SPA · 1.8 mo to decide
Awaiting Construction2025-09-30
Sainsburys Supermarkets, Hadleigh Road - Solar Panels
Sainsburys Supermarkets Limited · 25/00567/P3SPA · 1.8 mo to decide
0.24Awaiting Construction2025-09-29
Rope Walk - Solar PV Panels
ZLC Energy (Liskeard) · 24/00388/CLD · 1.6 mo to decide
Awaiting Construction2024-08-08
White House Road - Solar PV System
Hemisphere Freight Services · 23/00620/P3SPA · 1.6 mo to decide
0.2Awaiting Construction2023-09-21
Bluestem Road - Solar Panels
Menzies Distribution Limited · 22/00984/P3SPA · 1.5 mo to decide
0.29Awaiting Construction2023-01-10
Clarkson Port Services, Cliff Quay - Solar Panles
Associated British Ports · 22/00687/P3SPA · 1.8 mo to decide
0.86Awaiting Construction2022-09-29

Does Ipswich approve solar farms?

Yes — of the 6 solar farms Ipswich has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Ipswich?

The median time from application to decision is 1.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Ipswich consented?

2 MW has been consented across 6 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Ipswich

Battery storage in IpswichOnshore wind in Ipswich

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report