Renewable planning › Solar › High Peak
Solar planning in High Peak
High Peak has decided 6 solar farms and approved 100% of them, taking a median of 1.8 months to decide. Consented capacity: 2 MW.
⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How High Peak compares
Against the 298 UK authorities with 5+ solar decisions, High Peak sits in the 77th percentile for approval rate (7 points above the England average) and the 74th percentile for speed.
Decisions by year
Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (6)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Frith Knoll Road, Walker Industrial Park, Units 1-5 - Solar PV Modules Natural Stone Surfaces Limited · DET/2025/0022 · 1.8 mo to decide | — | Awaiting Construction | 2026-01-26 |
Glossop Caravans, Brookfield - Solar Panels Glossop Caravans · DET/2025/0012 · 1.8 mo to decide | 0.23 | Awaiting Construction | 2025-08-26 |
New Mills Leisure Centre, Hyde Bank Road - PV Panels High Peak Borough Council · HPK/2025/0032 · 1.4 mo to decide | 0.11 | Awaiting Construction | 2025-03-28 |
Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array Centrica Business Solutions · HPK/2023/0442 · 16.3 mo to decide | 1 | Awaiting Construction | 2025-03-10 |
Old House Farm, Newhaven - Solar Panels T H Flower & Sons · NP/GDO/0724/0712 · 2.1 mo to decide | 0.19 | Awaiting Construction | 2024-09-12 |
Pennine Aggregates, Waterswallows Lane - Solar Panels B-Engineering Group · DET/2023/0005 · 1.9 mo to decide | 0.34 | Awaiting Construction | 2023-05-02 |
Does High Peak approve solar farms?
Yes — of the 6 solar farms High Peak has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a solar farm application take in High Peak?
The median time from application to decision is 1.8 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much solar capacity has High Peak consented?
2 MW has been consented across 6 approved schemes. There are no applications currently awaiting a decision.
Other technologies in High Peak
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com