Renewable planning SolarEaling

Solar planning in Ealing

Ealing has decided 6 solar farms and approved 100% of them, taking a median of 3.8 months to decide. Consented capacity: 1 MW. 1 application still awaiting a decision.

100%
Approved
6 granted · 0 refused
3.8 mo
Median decision
UK 2.3 mo
1 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Ealing compares

Against the 298 UK authorities with 5+ solar decisions, Ealing sits in the 77th percentile for approval rate (7 points above the England average) and the 17th percentile for speed.

Decisions by year

35Approved — 1 (2021)121Approved — 2 (2024)224Approved — 3 (2025)325
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (8)

SchemeMWStatusDecided
International Trading Estate, Trident Way - Data Centre
GTR London 2 SARL · 250949FUL · 9.4 mo to decide
0.22Awaiting Construction2025-12-19
David Lloyd Leisure Centre - Solar PV Panels
David Lloyd Leisure Centre · 252787PAPV · 2.7 mo to decide
Awaiting Construction2025-10-14
Sergo Park Greenford Central, Phase 1A - Industrial, Warehouse & Offices
Segro Plc · 242581FUL · 6.2 mo to decide
0.38Awaiting Construction2025-01-21
Belazu Ingredient Company, Long Drive - Solar panels
Columbia Threadneedle Investments Limited · 243243PAPV · 2 mo to decide
0.31Awaiting Construction2024-10-21
Great Western Industrial Park, Armstrong Way - Solar Panels
F P Herting & Son Plc · 241446PAPV · 1.5 mo to decide
0.24Awaiting Construction2024-06-11
Prologis Greenford DC1, Oldfield Lane North - Solar Panels
Prologis UK Limited · 241161PAPV
0.35Application Submitted2024-03-20
University Of West London - Solar
University of West London · 214108PAPV · 4.8 mo to decide
0.2Awaiting Construction2021-11-25
University Of West London - Solar Photovoltaic & Ground Source Heat Pump
University of West London · 213804CPL
0.2Application Withdrawn2021-08-05

Does Ealing approve solar farms?

Yes — of the 6 solar farms Ealing has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Ealing?

The median time from application to decision is 3.8 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Ealing consented?

1 MW has been consented across 6 approved schemes. A further 1 application awaits a decision.

Other technologies in Ealing

Battery storage in EalingOnshore wind in Ealing

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.