Novarly ParcelRenewable planning

Renewable planning SolarAshfield

Solar planning in Ashfield

Ashfield has decided 14 solar farms and approved 86% of them, taking a median of 2.6 months to decide. Consented capacity: 26 MW. 2 applications still awaiting a decision.

86%
Approved
12 granted · 2 refused
2.6 mo
Median decision
UK 2.3 mo
26 MW
Consented
8 MW refused
0
Appeals
no appeals recorded

How Ashfield compares

Against the 298 UK authorities with 5+ solar decisions, Ashfield sits in the 17th percentile for approval rate (7 points below the England average) and the 44th percentile for speed.

Decisions by year

35Approved — 1 (2014)114Approved — 1 (2015)115Approved — 1 (2016)Refused — 2 (2016)316Approved — 1 (2021)121Approved — 4 (2024)424Approved — 4 (2025)425
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (18)

SchemeMWStatusDecided
Lamtek Limited, Wolsey Drive - Solar Panels
SS Green Energy · X/2025/0036 · 1.1 mo to decide
0.81Awaiting Construction2025-09-26
Hamilton Road - Solar Farm
Hamilton Solar Limited · V/2025/0412
7Application Submitted2025-07-04
Hucknall Leisure Centre, Linby Road - Solar Panels
Ashfield District Council · V/2023/0500 · 17.3 mo to decide
Awaiting Construction2025-02-06
Blenheim Park Road - Solar Panels
Electron Green · X/2024/0044 · 1.8 mo to decide
0.17Awaiting Construction2025-01-28
Lammas Leisure Centre, Lammas Road - Solar Panels
Ashfield District Council · X/2024/0051 · 1.3 mo to decide
0.19Awaiting Construction2025-01-28
ITP Aero, Harrier Park - Solar Panels
ITP Aero UK · X/2024/0041 · 0.9 mo to decide
1.9Awaiting Construction2024-12-04
Romo, Oddicroft Lane - Solar Panels
Romo limited · X/2024/0010 · 1.3 mo to decide
1Awaiting Construction2024-05-13
Brookside Way, Huthwaite - Solar Photovoltaics
Tack · X/2024/0011 · 0.9 mo to decide
0.3Awaiting Construction2024-05-09
Two Oaks Quarry, Coxmoor Road - Solar Array
The Mansfield Sand Company Limited · �F/4478 · 14.7 mo to decide
3.8Awaiting Construction2024-01-31
Hamilton Road - Solar Farm
Hamilton Solar Limited · V/2022/0562 · 4.6 mo to decide
7Revised2022-12-12
Sherwood Way South
Zestec Asset Management · V/2021/0430 · 2.6 mo to decide
2.73Awaiting Construction2021-09-14
Former Langton Colliery Site
Van Elle · V/2016/0137 · 3.9 mo to decide
5.7Planning Permission Expired2016-06-30
Two Dales Farm
Blue Planet Solar · V/2015/0459 · 8 mo to decide
4Application Refused2016-03-30
Whiteborough Farm
Raw Energy · V/2015/0518 · 5.5 mo to decide
2.2Abandoned2016-02-09
Warren House
OST Energy · V/2015/0618 · 3.6 mo to decide
4Application Refused2016-01-29
Fulwood Grange Farm
Fulwood Grange Solar Farm Limited · V/2015/0455 · 3.9 mo to decide
5Abandoned2015-11-25
Two Oaks Quarry
Mansfield Sand · V/2015/0589 · 0.5 mo to decide
5Planning Permission Expired2015-10-15
Crow Trees Farm
Foresight · V/2014/0188 · 2 mo to decide
4.7Operational2014-06-25

Does Ashfield approve solar farms?

Yes — of the 14 solar farms Ashfield has decided, 86% were approved (12 granted, 2 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Ashfield?

The median time from application to decision is 2.6 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Ashfield consented?

26 MW has been consented across 12 approved schemes, with 8 MW refused. A further 2 applications awaits a decision.

Other technologies in Ashfield

Battery storage in AshfieldOnshore wind in Ashfield

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.