Novarly ParcelRenewable planning

Renewable planning SolarAdur

Solar planning in Adur

Adur has decided 5 solar farms and approved 100% of them, taking a median of 2.3 months to decide. Consented capacity: 1 MW.

100%
Approved
5 granted · 0 refused
2.3 mo
Median decision
UK 2.3 mo
1 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Adur compares

Against the 298 UK authorities with 5+ solar decisions, Adur sits in the 77th percentile for approval rate (7 points above the England average) and the 51st percentile for speed.

Decisions by year

35Approved — 1 (2022)122Approved — 1 (2024)124Approved — 3 (2025)325
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Glaxo Smithkline, Southdownview Way - Photovoltaic Solar Panels
GlaxoSmithKline Dungarvan Limited · AWDM/0306/25 · 2.6 mo to decide
Awaiting Construction2025-08-08
Dunelm - Solar Panels
Advanced Renewable Power Limited · NOTICE/0006/25 · 2.3 mo to decide
0.16Awaiting Construction2025-07-07
Worthing College, Sanditon Way - Solar Panels
Green Nation Solar Energy · NOTICE/0023/24 · 1.8 mo to decide
0.19Awaiting Construction2025-03-03
Reception Shoreham Technical Centre - Solar PV Panel Panels
Ricardo Consulting Engineering Limited · NOTICE/0023/23 · 4.5 mo to decide
0.21Awaiting Construction2024-06-21
Chartwell Road - Solar Panels
Bidfood · NOTICE/0016/22 · 1.6 mo to decide
0.35Awaiting Construction2022-09-01
Lancing College Campus
Lancing College · SDNP/18/05306/FUL
1Application Withdrawn2019-03-11

Does Adur approve solar farms?

Yes — of the 5 solar farms Adur has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Adur?

The median time from application to decision is 2.3 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Adur consented?

1 MW has been consented across 5 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Adur

Battery storage in AdurOnshore wind in Adur

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.