Solar planning in Aberdeen City

Aberdeen City has decided 13 solar farms and approved 100% of them, taking a median of 1.5 months to decide. Consented capacity: 13 MW. 2 applications still awaiting a decision.

100%
Approved
13 granted · 0 refused
1.5 mo
Median decision
UK 2.3 mo
13 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

How Aberdeen City compares

Against the 298 UK authorities with 5+ solar decisions, Aberdeen City sits in the 77th percentile for approval rate (7 points above the England average) and the 95th percentile for speed.

Decisions by year

35Approved — 1 (2019)119Approved — 4 (2022)422Approved — 5 (2023)523Approved — 3 (2024)324
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (16)

SchemeMWStatusDecided
Health And Fitness Club, Garthdee Road - Solar Panels
Custom Solar Limited · 260265/DPP
0.32Application Submitted2026-03-18
Drumforskie - Solar Array
Forster Group Ltd · 251307/DPP
2.5Application Submitted2025-12-09
David Lloyd, Garthdee Road - Solar Panels
David Lloyd Leisure · 240005/DPP · 3.4 mo to decide
0.32Awaiting Construction2024-05-13
Siemens, Kirkton Drive - Solar Panels
Columbia Threadneedle Investments Limited · 231369/DPP · 3.8 mo to decide
0.19Awaiting Construction2024-02-26
Pitfodels House, North Deeside Road - Solar panels
International School of Aberdeen · 231488/DPP · 1.5 mo to decide
0.59Awaiting Construction2024-01-08
Nigg Waste Water Plant, Coast Road - Solar PV Arrays
Scottish Water Horizons · 230941/DPP · 1.4 mo to decide
1.13Awaiting Construction2023-09-15
Airyhall Distribution Service Reservoir, St Johns Terrace - Solar Panels
Scottish Water · 230212/DPP · 6 mo to decide
1.05Awaiting Construction2023-09-01
Aberdeen Hydrogen Hub Facility
Aberdeenshire Council / BP UK · 230299/DPP · 3.5 mo to decide
8Awaiting Construction2023-06-29
Joseph Robertson Limited, Sinclair Road - Solar Panels
Joseph Robertson (Aberdeen) Limited · 230425/DPP · 1.8 mo to decide
0.28Awaiting Construction2023-06-07
First Aberdeen, King Street - Solar Array
First Bus Group Limited · 230274/DPP · 1.5 mo to decide
0.19Awaiting Construction2023-04-21
Ithaca Energy, Hill Of Rubislaw - Solar Panels
Ithaca Energy · 220956/DPP · 0.8 mo to decide
0.16Awaiting Construction2022-09-09
North East Scotland College - Solar Panels
North East Scotland College · 220078/DPP · 1.3 mo to decide
0.3Awaiting Construction2022-03-08
North East Scotland College - Solar panels
North East Scotland College · 220073/DPP · 1.2 mo to decide
0.18Awaiting Construction2022-03-04
Peterseat Drive - Solar PV Panels
MacLean International Group Limited · 211659/DPP · 1.5 mo to decide
Awaiting Construction2022-01-10
Iron Mountain Howe Moss Drive
Iron Mountain · 191026/DPP · 2.9 mo to decide
0.3Operational2019-09-24
St Johns Terrace - Solar PV Array
Scottish Water
1.3No Application Required

Does Aberdeen City approve solar farms?

Yes — of the 13 solar farms Aberdeen City has decided, 100% were approved (13 granted, 0 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Aberdeen City?

The median time from application to decision is 1.5 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Aberdeen City consented?

13 MW has been consented across 13 approved schemes. A further 2 applications awaits a decision.

Other technologies in Aberdeen City

Battery storage in Aberdeen CityOnshore wind in Aberdeen City

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.