Onshore wind planning in Swale

Swale has decided 3 onshore wind schemes and approved 100% of them, taking a median of 10.7 months to decide. Consented capacity: 22 MW.

100%
Approved
3 granted · 0 refused
10.7 mo
Median decision
UK 11.5 mo
22 MW
Consented
across approved schemes
1
Appeals
1 allowed on appeal

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Swale compares

Against the 75 UK authorities with 5+ onshore wind decisions, Swale sits in the 98th percentile for approval rate (32 points above the England average) and the 69th percentile for speed.

Decisions by year

35Approved — 1 (2011)111Approved — 1 (2017)117
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (3)

SchemeMWStatusDecided
New Rides Wind Farm
Airvolution Energy · SW/13/1571 · 42.4 mo to decide
8.8Operational2017-08-09
HMP Standford Hill
Resonance · SW/10/1567 · 10.7 mo to decide
4.6Operational2011-11-11
Port of Sheerness Wind Farm (was Lappel Bank)
Peel Energy · SW/08/0896 · 6.5 mo to decide
8.2Operational2009-03-11

Does Swale approve onshore wind schemes?

Yes — of the 3 onshore wind schemes Swale has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Swale?

The median time from application to decision is 10.7 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Swale consented?

22 MW has been consented across 3 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Swale

Solar in SwaleBattery storage in Swale

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.