Onshore wind planning in South Staffordshire

South Staffordshire has decided 3 onshore wind schemes and approved 33% of them, taking a median of 3.7 months to decide. Consented capacity: 4 MW.

33%
Approved
1 granted · 2 refused
3.7 mo
Median decision
UK 11.5 mo
4 MW
Consented
19 MW refused
1
Appeals
0 allowed on appeal

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How South Staffordshire compares

Against the 75 UK authorities with 5+ onshore wind decisions, South Staffordshire sits in the 6th percentile for approval rate (35 points below the England average) and the 99th percentile for speed.

Decisions by year

35Approved — 1 (2010)Refused — 1 (2010)210Refused — 1 (2011)111
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (3)

SchemeMWStatusDecided
King's Street
Wind Prospect · 10/00963/FUL · 3.7 mo to decide
12Application Refused2011-04-06
Rodbaston
REG Windpower · 09/00524/FUL · 17 mo to decide
4Operational2010-12-15
Roundhill Sewage Works Wind Turbines
Severn Trent Water · 10/0232/LPAC · 1.6 mo to decide
6.8Appeal Refused2010-06-09

Does South Staffordshire approve onshore wind schemes?

Yes — of the 3 onshore wind schemes South Staffordshire has decided, 33% were approved (1 granted, 2 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in South Staffordshire?

The median time from application to decision is 3.7 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has South Staffordshire consented?

4 MW has been consented across 1 approved scheme, with 19 MW refused. There are no applications currently awaiting a decision.

Other technologies in South Staffordshire

Solar in South StaffordshireBattery storage in South Staffordshire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.