Onshore wind planning in South Holland
South Holland has decided 3 onshore wind schemes and approved 100% of them, taking a median of 15.1 months to decide. Consented capacity: 42 MW.
⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How South Holland compares
Against the 75 UK authorities with 5+ onshore wind decisions, South Holland sits in the 98th percentile for approval rate (32 points above the England average) and the 43rd percentile for speed.
Every recorded scheme (5)
| Scheme | MW | Status | Decided |
|---|---|---|---|
The Grange Wind Farm Renewable Energy Systems (RES) · H21-0439-09 · 15.9 mo to decide | 14 | Operational | 2010-10-15 |
Home Farm (wind) Unknown · H10-1390-06 | 4 | Application Withdrawn | 2010-04-30 |
Holbeach Marsh Wind Farm, Scottish Power Renewables · H09-1016-09 | 16 | Abandoned | 2009-12-25 |
Gedney Marsh Wind Prospect · H06/0035/03 · 8.4 mo to decide | 12 | Operational | 2003-09-27 |
Deeping St Nicholas Wind Farm Wind Prospect Developments · H03-0161-02 · 15.1 mo to decide | 16.4 | Operational | 2003-05-18 |
Does South Holland approve onshore wind schemes?
Yes — of the 3 onshore wind schemes South Holland has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a onshore wind scheme application take in South Holland?
The median time from application to decision is 15.1 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much onshore wind capacity has South Holland consented?
42 MW has been consented across 3 approved schemes. There are no applications currently awaiting a decision.
Other technologies in South Holland
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.