Renewable planning › Onshore wind › Rotherham
Onshore wind planning in Rotherham
Rotherham has decided 3 onshore wind schemes and approved 100% of them, taking a median of 10.2 months to decide. Consented capacity: 27 MW.
⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Rotherham compares
Against the 75 UK authorities with 5+ onshore wind decisions, Rotherham sits in the 98th percentile for approval rate (32 points above the England average) and the 74th percentile for speed.
Every recorded scheme (3)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Penny Hill Lane Banks Renewables · RB2009/0824 · 10.2 mo to decide | 19.8 | Operational | 2010-05-27 |
Loscar Farm REG Windpower (previously Cornwall Light and Power) · 40.8 mo to decide | 4.5 | Operational | 2008-03-28 |
Advanced Manufacturing Research Centre Unknown · 5 mo to decide | 2.6 | Operational | 2007-06-01 |
Does Rotherham approve onshore wind schemes?
Yes — of the 3 onshore wind schemes Rotherham has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a onshore wind scheme application take in Rotherham?
The median time from application to decision is 10.2 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much onshore wind capacity has Rotherham consented?
27 MW has been consented across 3 approved schemes. There are no applications currently awaiting a decision.
Other technologies in Rotherham
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.