Onshore wind planning in Redcar and Cleveland

Redcar and Cleveland has decided 1 onshore wind scheme and approved 0% of them, taking a median of 5.8 months to decide.

0%
Approved
0 granted · 1 refused
5.8 mo
Median decision
UK 11.5 mo
0 MW
Consented
3 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Redcar and Cleveland compares

Against the 75 UK authorities with 5+ onshore wind decisions, Redcar and Cleveland sits in the 0th percentile for approval rate (68 points below the UK average) and the 93rd percentile for speed.

Screening a site of your own?

RedlineUK · £39

Redcar and Cleveland approves 0% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site£39
Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Every recorded scheme (4)

SchemeMWStatusDecided
Wilton
Airvolution Energy · R/2014/0074/FFM
6.6Application Withdrawn2016-05-26
Bank Field Wind Farm
Banks Renewables · R/2013/0674/FFM
17Application Withdrawn2015-07-31
Kilton Wind Turbine
TNEI Services · R/2014/0433/FF · 4.7 mo to decide
2.5Application Refused2014-11-27
Tees Wind North
Corus · R/2001/936/FF · 7 mo to decide
45Abandoned2002-07-16

Does Redcar and Cleveland approve onshore wind schemes?

Yes — of the 1 onshore wind schemes Redcar and Cleveland has decided, 0% were approved (0 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Redcar and Cleveland?

The median time from application to decision is 5.8 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Redcar and Cleveland consented?

0 MW has been consented across 0 approved schemes, with 3 MW refused. There are no applications currently awaiting a decision.

Other technologies in Redcar and Cleveland

Solar in Redcar and ClevelandBattery storage in Redcar and Cleveland

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.