Onshore wind planning in Mid Suffolk

Mid Suffolk has decided 2 onshore wind schemes and approved 50% of them, taking a median of 3.6 months to decide. Consented capacity: 5 MW.

50%
Approved
1 granted · 1 refused
3.6 mo
Median decision
UK 11.5 mo
5 MW
Consented
7 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Mid Suffolk compares

Against the 75 UK authorities with 5+ onshore wind decisions, Mid Suffolk sits in the 20th percentile for approval rate (18 points below the England average) and the 99th percentile for speed.

Every recorded scheme (3)

SchemeMWStatusDecided
J.W. Baldwin Wind Farm
Eye Wind Power Ltd · 0385/11
6.8Application Withdrawn2012-02-23
Humphrey Group
Roy Humphrey Group · 0724/10 · 4.3 mo to decide
5Operational2010-07-20
Potash Farm
Wind Power Renewables · 1826/09 · 3 mo to decide
6.6Application Refused2009-10-20

Does Mid Suffolk approve onshore wind schemes?

Yes — of the 2 onshore wind schemes Mid Suffolk has decided, 50% were approved (1 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Mid Suffolk?

The median time from application to decision is 3.6 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Mid Suffolk consented?

5 MW has been consented across 1 approved scheme, with 7 MW refused. There are no applications currently awaiting a decision.

Other technologies in Mid Suffolk

Solar in Mid SuffolkBattery storage in Mid Suffolk

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.