Onshore wind planning in Dundee City

Dundee City has decided 1 onshore wind scheme and approved 100% of them, taking a median of 15.9 months to decide. Consented capacity: 4 MW.

100%
Approved
1 granted · 0 refused
15.9 mo
Median decision
UK 11.5 mo
4 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Dundee City compares

Against the 75 UK authorities with 5+ onshore wind decisions, Dundee City sits in the 98th percentile for approval rate (32 points above the England average) and the 37th percentile for speed.

Every recorded scheme (1)

SchemeMWStatusDecided
Michelin Tyre Co Ltd - Dundee
Ecotricity · 03/00424/FUL · 15.9 mo to decide
4Operational2004-09-26

Does Dundee City approve onshore wind schemes?

Yes — of the 1 onshore wind schemes Dundee City has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Dundee City?

The median time from application to decision is 15.9 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Dundee City consented?

4 MW has been consented across 1 approved scheme. There are no applications currently awaiting a decision.

Other technologies in Dundee City

Solar in Dundee CityBattery storage in Dundee City

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.