Battery storage planning in York

York has decided 5 battery storage schemes and approved 100% of them, taking a median of 6.9 months to decide. Consented capacity: 498 MW. 3 applications still awaiting a decision.

100%
Approved
5 granted · 0 refused
6.9 mo
Median decision
UK 6 mo
498 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How York compares

Against the 137 UK authorities with 5+ battery storage decisions, York sits in the 73rd percentile for approval rate (8 points above the England average) and the 36th percentile for speed.

Decisions by year

35Approved — 1 (2020)120Approved — 4 (2025)425
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (8)

SchemeMWStatusDecided
Meadowville, Hull Road - Battery Energy Storage System
UK Battery Storage Limited · 25/01435/FUL · 2.8 mo to decide
48Awaiting Construction2025-10-23
East York Energy Hub
York Energy Park Limited · 24/02303/FULM · 8.9 mo to decide
249.9Awaiting Construction2025-09-15
Murton Way - Battery Energy Storage
First Way Solar Limited · 25/00743/FULM · 22.8 mo to decide
100Awaiting Construction2025-07-17
Sutton-on-the-Forest, Brownmoor Lane -BESS
Ampyr Energy UK Development Limited · ZB25/01321/FUL
10Application Submitted2025-07-14
Meadowville, Hull Road - Battery Energy Storage System
UK Battery Storage Limited · 25/00547/FUL
48Revised2025-06-12
Monets Garden Battery, Osbaldwick - Energy Storage Facility
Monets Garden Battery Limited · 24/01851/FULM · 4.9 mo to decide
50Awaiting Construction2025-03-28
Murton Way - Battery Energy Storage
First Way Solar Limited · 23/02030/FULM · 12.6 mo to decide
100Revised2024-12-09
Osbaldwick Substation
UK Battery Storage · 20/01515/REM · 1.6 mo to decide
49.9Operational2020-10-08

Does York approve battery storage schemes?

Yes — of the 5 battery storage schemes York has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in York?

The median time from application to decision is 6.9 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has York consented?

498 MW has been consented across 5 approved schemes. A further 3 applications awaits a decision.

Other technologies in York

Solar in YorkOnshore wind in York

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report