Battery storage planning in Wyre

Wyre has decided 4 battery storage schemes and approved 100% of them, taking a median of 2.8 months to decide. Consented capacity: 59 MW.

100%
Approved
4 granted · 0 refused
2.8 mo
Median decision
UK 6 mo
59 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Wyre compares

Against the 137 UK authorities with 5+ battery storage decisions, Wyre sits in the 73rd percentile for approval rate (8 points above the England average) and the 90th percentile for speed.

Decisions by year

35Approved — 1 (2017)117Approved — 1 (2021)121Approved — 2 (2023)223
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (4)

SchemeMWStatusDecided
Mount Pleasant Farm, Green Lane - Battery Storage
Barton Battery Storage · 06/2022/0763 · 9.4 mo to decide
45Awaiting Construction2023-10-03
Archway Travel, Copse Road - Battery Storage Facility
Renepower Energy Limited · 23/00298/FUL · 3.3 mo to decide
Awaiting Construction2023-06-29
Cocker Avenue - Energy storage facility
AMP Energy Services Limited · 21/00510/FUL · 2.2 mo to decide
7.5Awaiting Construction2021-06-25
Aldon Road
STOR Power · 17/00912/FUL · 2.3 mo to decide
6Planning Permission Expired2017-12-08

Does Wyre approve battery storage schemes?

Yes — of the 4 battery storage schemes Wyre has decided, 100% were approved (4 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Wyre?

The median time from application to decision is 2.8 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Wyre consented?

59 MW has been consented across 4 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Wyre

Solar in WyreOnshore wind in Wyre

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.