Renewable planning › Battery storage › Warwick
Battery storage planning in Warwick
Warwick has decided 5 battery storage schemes and approved 40% of them, taking a median of 4.9 months to decide. Consented capacity: 132 MW. 2 applications still awaiting a decision.
⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Warwick compares
Against the 137 UK authorities with 5+ battery storage decisions, Warwick sits in the 0th percentile for approval rate (52 points below the England average) and the 63rd percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (7)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Micro Energy Storage Unit, Kenilworth Road - Micro Energy Storage Facility AMP Clean Energy · W/25/1475 · 2.7 mo to decide | 0.2 | Application Refused | 2026-01-18 |
Fosse Way - Battery Storage Staffordshire Solar 1 Limited · W/24/1404 · 7.2 mo to decide | — | Application Refused | 2025-05-22 |
Holly Lane Energy Park - Solar Farm & Battery Storage Exagen · W/23/1358 · 16.6 mo to decide | 75 | Awaiting Construction | 2025-01-30 |
Honiley Road - Solar Farm & Battery Storage Enso Green Holdings Limited · W/22/1577 | 57 | Awaiting Construction | 2022-10-06 |
Banner Hill Farm, Banner Hill & Rouncil Lane - Battery Storage Flexion Energy Storage UK Limited · W/22/0941 · 1.8 mo to decide | 49.9 | Application Refused | 2022-09-30 |
Sherbourne - Solar Farm Namene Solar · W/22/0997 | — | Revised | 2022-09-08 |
Honiley Road - Battery Storage Enso Green Holdings P Limited · W/21/2080 | — | Revised | 2021-11-19 |
Does Warwick approve battery storage schemes?
Yes — of the 5 battery storage schemes Warwick has decided, 40% were approved (2 granted, 3 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Warwick?
The median time from application to decision is 4.9 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Warwick consented?
132 MW has been consented across 2 approved schemes, with 50 MW refused. A further 2 applications awaits a decision.
Other technologies in Warwick
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.