Novarly ParcelRenewable planning

Renewable planning Battery storageTonbridge and Malling

Battery storage planning in Tonbridge and Malling

Tonbridge and Malling has decided 3 battery storage schemes and approved 100% of them, taking a median of 3 months to decide. Consented capacity: 37 MW. 3 applications still awaiting a decision.

100%
Approved
3 granted · 0 refused
3 mo
Median decision
UK 6 mo
37 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Tonbridge and Malling compares

Against the 137 UK authorities with 5+ battery storage decisions, Tonbridge and Malling sits in the 73rd percentile for approval rate (8 points above the England average) and the 88th percentile for speed.

Decisions by year

35Approved — 1 (2017)117Approved — 1 (2022)122Approved — 1 (2025)125
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Corona Terrace And Hollow Lane - Micro Energy Storage System
AMP Clean Energy · 25/01965/PA
0.2Application Submitted2025-11-24
Mackenders Close - Micro Energy Storage Facility
AMP Energy Services Limited · 24/01762/PA · 3 mo to decide
0.2Awaiting Construction2025-01-29
Platt Industrial Estate,Maidstone Road - Micro Energy Storage Facility
Aggregated Micro Power Holdings Plc · 24/01701/PA
0.2Application Submitted2024-10-21
Platt Industrial Estate,Maidstone Road - Micro Energy Storage Facility
Aggregated Micro Power Holdings Plc · 24/00772/PA
0.2Revised2024-05-15
Wouldham Road, Wouldham - Battery Storage Facility
AMP Energy Services Limited · 21/03038/FL · 1.8 mo to decide
7.5Awaiting Construction2022-01-06
Aylesford BESS
Zenobe · 17/02496/FL · 3 mo to decide
29Operational2017-12-05

Does Tonbridge and Malling approve battery storage schemes?

Yes — of the 3 battery storage schemes Tonbridge and Malling has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Tonbridge and Malling?

The median time from application to decision is 3 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Tonbridge and Malling consented?

37 MW has been consented across 3 approved schemes. A further 3 applications awaits a decision.

Other technologies in Tonbridge and Malling

Solar in Tonbridge and MallingOnshore wind in Tonbridge and Malling

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com